GGC was engaged by Duratec Australia to deliver complex access solutions for the INPEX MOF Remediation Project, a critical piece of infrastructure supporting LNG operations in the Northern Territory.
GGC delivered 160 tonnes of complex tube and clip scaffold for the remediation of INPEX’s Module Offloading Facility, the first scaffold ever erected within the LNG plant, completed with zero incidents.
Approved by INPEX Japan, the design included over-water cantilevers and intricate under-soffit access using 6m and 8m lattice beams. Spanning 360 metres, the scaffold was completed during a fast-tracked three-month dry season window, staged over water and around significant spring tides enabling critical remediation, blasting, and painting works.